![]() Click on one of the categories below to see related documents or use the search function. Santa Margarita Water District proudly provides drinking water, recycled water and wastewater services to over 200,000 residents. The Document Center provides easy access to public documents. ![]() ![]() The District operates the system under contract on behalf of the member agencies, including our own District. The JTM was constructed by Tri-Cities in 1961/1962 to transport potable water approximately 38 miles from a connection in Irvine to two reservoirs in San Clemente, Palisades Dam/Roy A. The system’s infrastructure components, including the Joint Transmission Main (JTM), are essential to ensuring the region’s imported water can be delivered safely and effectively. We are pleased to submit the Santa Margarita Water District (District) Comprehensive Annual Financial Report (CAFR) for the fiscal year ended on June 30, 2019. The system was formerly managed by Tri-Cities Municipal Water District. Please view job descriptions for the Santa Margarita Water District by clicking on the title for which you are interested. In 2000, South Coast Water District contracted operations and maintenance of the JRWSS. The Districts financial statements have been audited by CliftonLarsonAllen LLP, a firm of licensed certified public accountants experienced in auditing special. The JRWSS brings imported drinking water from Metropolitan Water District’s Diemer Filtration Plant in Yorba Linda to retail water agencies and cities in south Orange County. SMWD is Orange County’s second-largest water district, serving more than 155,000 residents and. Both petitions were filed with the understanding that the data has shown evidence of little to no impact on the San Juan Basin, and will continue to have no significant effects.The Joint Regional Water Supply System (JRWSS) is a valuable piece of our region’s water supply reliability. Tue 04 Aug, 2020 - 4:12 PM ET Fitch Ratings - San Francisco - : Fitch Ratings has assigned the following ratings to obligations issued by the Santa Margarita/Dana Point Authority, CA (the authority) on behalf of the Santa Margarita Water District, CA (the district): -51.6 million water and wastewater revenue bonds, series 2020A. The petition for extension of time was filed to extend project implementation for another 15 years until 2025. The petition for change was filed to amend annual monitoring of groundwater levels to periods of dryer than normal years, and to terminate annual vegetation monitoring. This program is designed to satisfy mitigation recommendations and release an annual report based on the collection of surface water, groundwater, biotic and climate data gathered in the field which is also supplemented with previously existing data from reliable sources.ĭue to the conclusion of negligible impacts of Phase 1 of the Plan, the SJBA has filed two petitions with the State Water Resources Control Board (SWRCB). Upon the completion of the Plan, Santa Margarita Water District (SMWD) is able to operate under a permit issued by the State Water Resources Control Board, granting the District the right to divert up to 8,000 acre-feet of water per year for municipal purposes.ĭue to concerns regarding the potential impact of these facilities, SJBA developed a joint groundwater monitoring program with Santa Margarita Water District (SMWD) and South Coast Water District (SCWD). Phase 1 - Completed in 2004, this phase included new production wells and a desalter facility the Groundwater Recovery Plant (GWRP). In 2004, the San Juan Basin Authority developed a phased plan to maximize the use of local ground and surface water within the San Juan Creek Basin. Dan Ferons of the Santa Margarita Water District and Paul Liu of the Los Angeles Department of.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |